Your (factual) EPBD calendar: which dates are fixed, and which aren't.

  • Energy
  • Legislation
  • Explainer
This comundo blog post about an EPBD calendar is a aerial shot of Aarhus, Denmark. We can see lots of typically Danish residential houses with red roofs, and green yards between them.

Every explainer on the EPBD (Energy Performance of Buildings Directive) gives you a list of dates, but what’s missing is any indication of how solid each one is.

And that’s what we’ll fix here, as the distinction matters. Some of these dates are fixed in EU law and won't move. Some are targets a member state has to plan towards, not deadlines you'll be measured against. At least one is widely reported as a ban and isn't one. And the dates that will actually bind you as a Danish owner haven't been published yet, because Denmark hasn't finished writing them.

As always, it’s a glorious jumble. But here’s our version. Significantly less jumbly, with a straight answer on each entry.

Already in force

Date
What
How fixed
1 Jan 2025
WhatNo public financial incentives for stand-alone fossil-fuel boilers
How fixedFixed in law
1 Jan 2026
How fixedFixed in Danish law
11 Jan 2026
How fixedApplies now – guidelines, so "should" not "shall". Small institutions have until Jan 2027
29 May 2026
How fixedPassed, and missed by all 27
15 Jul 2026
How fixedHappened

The 29 May date is important for Denmark. The country’s current energy-label scale has been in force since July 2018, which sits outside the window that would have earned it a delay to 2029. So the rescaling isn't years away – it's overdue.

Coming, and fixed in EU law

Date
What
Scope
31 Dec 2026
ScopeNew public buildings and new non-residential buildings over 250 m²
31 Dec 2027
ScopeExisting non-residential over 500 m², when undergoing major renovation or works needing a permit for renovation, roof works, or a technical building system. Also existing public buildings over 2,000 m²
1 Jan 2028
ScopeNew buildings owned by public bodies
1 Jan 2028
ScopeNew buildings over 1,000 m²
31 Dec 2028
ScopeExisting public buildings over 750 m²
31 Dec 2029
ScopeAll new residential buildings, and new roofed car parks next to buildings
1 Jan 2030
WhatZero-emission standard
ScopeAll new buildings
1 Jan 2030
WhatLife-cycle carbon on the EPC
ScopeAll new buildings
2030
WhatMinimum energy performance standard – the 16% threshold
ScopeNon-residential
31 Dec 2030
WhatSolar installations required
ScopeExisting public buildings over 250 m²
2033
WhatMinimum energy performance standard – the 26% threshold
ScopeNon-residential
2035
WhatResidential stock: average primary energy down 20–22% against 2020
ScopeNational trajectory

An important row to notice is 31 December 2027. Everyone reads "major renovation" and files it under future problems. But the trigger is broader than that: works requiring a permit for roof works or for installing a technical building system also bring the solar obligation into scope.

If you have roof work planned on a non-residential building over 500 m², that's worth finding out now rather than falling over later. The obligation is also subject to technical and economic feasibility, so it isn't absolute, but you want to know before you're mid-project.

Fixed as an obligation, not yet as a number

Item
Status
Denmark's MEPS thresholds for 2030 and 2033
StatusIn draft. The consultation bill proposes 190 kWh/m²/yr by 2030 and 168 by 2033, applied to the calculated figure behind your certificate. Roughly E/D and D/C on the current label scale. Buildings with special energy needs get a supplement on top. Not law yet
MEPS thresholds for 2040 and 2050
StatusDenmark must set them. The draft bill sketches a direction but fixes no binding values. They'll be confirmed in the national building renovation plan, due end-2026
Whether the 16% is measured by building count or floor area
StatusMember-state choice. Changes where the national line lands, not how your own buildings are judged against it
The energy-label rescaling itself
StatusOverdue. Date unknown, because the implementing law hasn't passed

That second row matters for anyone planning beyond 2033: the direction is certain, the numbers aren't, and they’ll arrive in a document Denmark should deliver by the end of this year.

Dates that get reported wrong

Three dates that are often reported incorrectly, and are worth correcting.

"Fossil-fuel boilers are banned from 2040." They aren’t. There is no EU ban. What the directive does is require member states to set out credible policies "with a view to" a complete phase-out, and 2040 is an indicative target date. The only hard, dated obligation is the one already in force: no public financial incentives for stand-alone fossil boilers since January 2025. Any actual ban will be Danish, not European.

"All buildings must be zero-emission by 2050." A zero-emission building stock by 2050 is the directive's stated objective, and the anchor member states plan against. It is not a compliance deadline for individual buildings, and there is no obligation to renovate an existing building to a zero-emission standard at all.

"The worst 16% must be renovated by 2030." The 16% defines a threshold, not a quota. Denmark sets a maximum energy performance level calibrated so that the worst-performing 16% of the 2020 stock sits above it; every non-residential building then has to come below that level. It’s not "renovate 16% of your portfolio", and depending on where the line falls, it could affect more of your portfolio than that, or less.

Two that will move within weeks

Revised ESRS. The Commission adopted the delegated act on 3 July 2026. It isn't legally effective yet – it needs to clear scrutiny and be published in the Official Journal, which is expected shortly. It will apply to financial years beginning on or after 1 January 2027, with early adoption for 2026 permitted once it's in force.

CSRD scope. If you’re still working from the old "wave" model, it’s gone. Omnibus I came into force on 18 March 2026 and replaced the staggered waves with a single test: more than 1,000 employees and more than €450 million turnover. Companies originally caught in wave one are exempt for 2025 and 2026. Denmark has until March 2027 to transpose it.

The numbers exist in draft. The law that would make them binding doesn’t

This is the bottom line. Everything above is European. What you'll be measured against is Danish law, and Denmark hasn't finished writing it, which is why the Commission opened proceedings in July.

None of the useful preparation depends on the final outcome. All of it is possible now, and all of it gets more expensive in the quarter when everyone needs it at once.

We'll update this calendar as the Danish dates land. If you'd rather not check back, the short version is: the direction hasn't been in doubt for two years, and the preparation was always the same.

So get started.

Lara Mulady

Lara Mulady

Director of brand and marketing

Lara manages brand and marketing at comundo. She has 15+ years of experience in brand, content and copywriting for B2B startups and scaleups, and buys way too much LEGO.